Skip to content
Ayzair
Warehouses & Logistics cooling and ventilation by Ayzair

Warehouses & Logistics

Beat heat stratification across high-bay storage, improve picker comfort and reduce humidity-related product damage.

1,200 m²

Coverage per HVLS fan

70%

Energy saved vs small fans

≤40 dB(A)

Sound level

The problem

What goes wrong without it

  • In tall storage buildings, hot air stratifies at roof level while the picking aisles stay stagnant — a 10 °C difference between floor and ceiling is common.
  • Still, humid air condenses on cartons and shrink-wrap, damaging stock and labels in monsoon months.
  • Loading docks cycle open all day, so any sealed cooling investment leaks straight out of the building.

The Ayzair approach

How we solve it

  • HVLS fans destratify the entire volume — one Ayzair-24 covers up to 1,200 m², replacing 10–20 small fans while drawing just 1.5 kW.
  • Continuous gentle air movement keeps surfaces dry, cutting condensation-related product damage without any refrigeration.
  • Where the heat load justifies it, roof-side evaporative coolers feed cooled fresh air into the aisles through short-radius elbow ducts.

Free assessment

Let us size your warehouses site.

Send the dimensions and what happens inside. We will return a complete equipment schedule with connected load and installed cost — free, within one working day.

Or WhatsApp instantly

We respond within one working day. Your details are used only to prepare your quotation.

Next step

Let us size the right system for your building.

Share your floor area, roof height and what happens inside. A member of our engineering team will return a no-obligation quotation within 24 hours.

Call nowGet a quote